UNSW Paddington Goods Lift Removal
Lift Removal
Project Type
Education
Industry
Overhead Traction
Lift Type
UNSW
Client
ERS partnered with Liftronic in November 2017 to help with a Lift Replacement Project on a large goods Lift including installing an engineered large lifting beam, removing the existing lift and motor room gear, Full ripout and make good
1
Total Lifts
4
Total Floors
Project Summary
Contractor – Liftronic
Project Manager – Wayne Campbell
Project Site – UNSW Paddington
Project Date – Nov 2017
Project Scope Includes:
- Complete Removal of 1×4 Stop OHT Lift
- Provide and Install Certified Large Lifting Beam
- Full Ripout, Cutting new door frames size and make good
- Installed lockable Hoardings for the duration of the project
- Motor room and counterweight removal
- Installation of large Storage Compound
- Removal/Recycling of rubbish and debris as required
For further information regarding this project contact the ERS Project Team on 1300 747 688