Phillipine Consulate, Sydney
Lift Removal
Project Type
Commercial
Industry
Hydro
Lift Type
Liftronic
Contractor
ERS partnered with Liftronic in October 2018 to help with a Lift Replacement Project including installing a lifting beam, removing the existing lift and motor room gear.
1
Total Lifts
3
Total Floors
Project Summary
Contractor – Liftronic
Project Site –Phillipine Consulate, Sydney
Project Date – October 2018
Project Scope Includes:
- Complete Removal of 1×3 Stop Hydro Lift
- Provide and Install Certified Lift Beam
- Extend the existing mains from the LMR to the Controller
- Removed doors, retained door frames
- Installed lockable Hoardings for the duration of the project
- Motor room and counterweight removal
- Remove/Recycle Pump Oil
- Removal/Recycling of rubbish and debris as required