Phillipine Consulate, Sydney

Lift Removal
Commercial
Hydro
Liftronic
ERS partnered with Liftronic in October 2018 to help with a Lift Replacement Project including installing a lifting beam, removing the existing lift and motor room gear.
1

Total Lifts

3

Total Floors

Project Summary

Contractor – Liftronic
Project Site –Phillipine Consulate, Sydney
Project Date – October 2018
Project Scope Includes:

  • Complete Removal of 1×3 Stop Hydro Lift
  • Provide and Install Certified Lift Beam
  • Extend the existing mains from the LMR to the Controller
  • Removed doors, retained door frames
  • Installed lockable Hoardings for the duration of the project
  • Motor room and counterweight removal
  • Remove/Recycle Pump Oil
  • Removal/Recycling of rubbish and debris as required

For further information regarding this project contact the ERS Project Team on 1300 747 688