309 Sussex St, Sydney Make safe
Make Safe
Project Type
Building Site
Industry
Overhead Traction
Lift Type
Infinity Contruction
Client
ERS completed a make safe for the onsite builder Dec 2015
1
Total Lifts
6
Total Floors
Project Summary
Contractor – Infinity Construction
Project Site – 309 Sussex St, Sydney
Project Date – December 2015
Project Scope Includes:
- Decomissioned/Make Safe onsite 6 stop OHT lift
- Confirmed Zero Energy for the client
- Lift stuck on the bottom floor with the Counterweight on the top level
- ERS Riggers established site and set up
- Low and Safely rigged up the counterweight and lowered it down into the pit with the lift car
- Removal/Recycling of rubbish and debris as required