ERS completed a make safe for the onsite builder Dec 2015
1

Total Lifts

6

Total Floors

Project Summary

Contractor – Infinity Construction
Project Site – 309 Sussex St, Sydney
Project Date – December 2015
Project Scope Includes:

  • Decomissioned/Make Safe onsite 6 stop OHT lift
  • Confirmed Zero Energy for the client
  • Lift stuck on the bottom floor with the Counterweight on the top level
  • ERS Riggers established site and set up
  • Low and Safely rigged up the counterweight and lowered it down into the pit with the lift car
  • Removal/Recycling of rubbish and debris as required