222 City Walk, Canberra

Lift Removal
Commercial
Underslung
Schindler
June 2016 ERS worked with Schindler on the Lift Replacement at 222 City Walk, Canberra
2

Total Lifts

24

Total Floors

Project Summary

Contractor – Schindler
Project Manager – Jeremy Outzen
Project Site – 222 City Walk, Canberra ACT
Project Date – May 2016
Project Scope Includes:

  • Complete Removal of 2×12 Stop Underslung Lift
  • Provide and Install Certified Lift Beam
  • Removed doors, retained door frames
  • Installed lockable Hoardings for the duration of the project
  • Motor room and counterweight removal
  • Blocked in LMR Peno
  • Painted LMR
  • Removal/Recycling of rubbish and debris as required