Macquarie Centre

Refurbishment
Shopping Centre
Hydro
Westfield
ERS worked with NASS/Westfields in April 2014 on a Macquarie Centre elevator upgrade. Tasks included: removing Hydro elevators, door and frame removal in an open shaft
2

Total Lifts

4

Total Floors

Project Summary

Contractors – NASS/Westfields
Project Manager – Rob Mitchell
Project Date – April 2014
Project Scope Includes:

  • Removal of 2×8 stop Hydro
  • Install a working platform on top of car in an open shaft
  • Large scale Building/Demo Site
  • Doors and Frames to be removed
  • Remove 800L of oil from the Pitt
  • Strip shaft and stainless steel flushings from the entire shaft
  • Removal/Recycling of rubbish and debris as required

For further information regarding this project contact the ERS Project Team on 1300 747 688