12A Rodborough Rd, Frenches Forest

Building Works
Commercial
Underslung
ERS assisted the onsite Installers with difficult concrete cutting of the Controller and Button boxes inside a sensitive environment then Make good
1

Total Lifts

Total Floors

Project Summary

Contractor – CBRE/Whitfield Rose
Project Site – 12A Rodborough Rd, Frenches Forest
Project Date – October 2018
Project Scope Includes:

  • Concrete cutting controller and button boxes
  • Data centre
  • Cutting in and around tile lobby
  • Make good back to existing finish
  • Removal/Recycling of rubbish and debris as required

For further information regarding this project contact the ERS Project Team on 1300 747 688